NZ BUILDING CODE was changed on 01.11.2021. E3/AS1 SECTION 3.0 OF The building code covers water splash just three suitable floorings listed in 3.1.1 Floors. The most impact relates to the wet area use of flooring products will need to be covered by an Alternative Solution to meet building requirements.
The provided document offers guidance, and it’s crucial to understand that compliance depends on the integrity of the entire system. It is imperative to follow the specifications rigorously during installation to guarantee that the system meets the New Zealand Building Code (NZBC) regulations.
Whether it involves modifying the original design or creating a new plan, please ensure that the alternative solution is submitted to the council for review. Construction should only proceed after the review has been approved.
NZBC Alternative Solution for Wet Areas |
Installation Performance Compliance Design Guide |
Overlay Flooring product system |